    Chemical plant: 24" Phenol Pipeline Maintain
    date / 2017-09-22 14:35:54  read /
    This project finished in Sep.2016. It’s a rental project, owner required NODHA supply the 24” cold cutting machine and operator, owner supply the lifting equipment.

    On site cold cutting in chemical plant require explosion proof operation, so we bring ODP-610 go to the site, below pictures show how to lifting the equipment to working site, how to split the frame and job achieved.

    Lifting to Working Site
    Split the frame 
    Install the first half on the pipeline

    Owner: FORMOSA PHENOL(NINGBO) LIMITED COMPANY
    Project: 24” Phenol pipe line maintenance
    Site: Ningbo China
    Date: 17th Sep. 2016
    ad
  • “ONE NIGHT 给小孩”北京站探访 周迅刘雯共奏可爱“交响曲” 2019-04-07
  • 言而无信似乎成了特朗普政府的特质与标致 2019-04-04
  • 90后听障女孩北漂学舞 王力宏为她写歌:我欣然接受我的不完美 2019-03-31
  • 北京冬奥会张家口赛区志愿者培养工作启动 2019-03-31
  • 动感单车运动过度会导致严重身体损伤 2019-03-30
  • 十多次告病危 2岁高危白血病男童盼来“生命火种” 2019-03-30
  • “天地生成 造化品汇——避暑山庄·外八庙皇家瑰宝大展”亮相中国园林博物馆 2019-03-22
  • 十堰神定河水质净化工程6月底试运营 2019-02-27
  • 高清:揭幕战东道主上演神奇换人 五球轻取沙特 2019-02-27
  • 30卷本《海德格尔文集》在中国人民大学举行新书发布会 2018-12-11
  • 办过周永康、孙政才、令计划案的检法机关,拟双双换帅 2018-08-20
  • 【理上网来·喜迎十九大】人民军队的制胜之本力量之源 2018-08-20
  • 400| 452| 360| 671| 678| 382| 384| 577| 950| 660|