    Chemical plant: 24" Phenol Pipeline Maintain
    date / 2017-09-22 14:35:54  read /
    This project finished in Sep.2016. It’s a rental project, owner required NODHA supply the 24” cold cutting machine and operator, owner supply the lifting equipment.

    On site cold cutting in chemical plant require explosion proof operation, so we bring ODP-610 go to the site, below pictures show how to lifting the equipment to working site, how to split the frame and job achieved.

    Lifting to Working Site
    Split the frame 
    Install the first half on the pipeline

    Owner: FORMOSA PHENOL(NINGBO) LIMITED COMPANY
    Project: 24” Phenol pipe line maintenance
    Site: Ningbo China
    Date: 17th Sep. 2016
    ad
  • 《在人间》第153期:南疆十日 2019-06-04
  • 定格——西部网图片频道 2019-06-04
  • 上海合作组织青岛峰会举行 习近平主持会议并发表重要讲话 2019-06-02
  • 发挥自身优势 奋力走在前列——习近平总书记在山东考察回访记 2019-06-01
  • 草民早就说过,如果只讲发展就能解决所有问题,那么发展马克思主义也太容易了。爱因斯坦的相对论超越了牛顿力学,但相对论适应不同的时空。 2019-05-26
  • 展开美丽中国的时代画卷——十九大代表聚焦生态文明建设 2019-05-14
  • 推动能源革命 促山西资源型经济转型发展 2019-05-14
  • 沃尔沃S60也玩性能版,或售45万起剑指奥迪S4,就问你怕了吗? 2019-05-03
  • 国家级·西安经济技术开发区————西部网 陕西头条 2019-05-03
  • 网友建言——黄河新闻网 2019-05-02
  • 美媒:中国歼10改进型能力强悍,已成美空军强大威胁 2019-05-02
  • 西部网(陕西新闻网)www.cnwest.com 2019-04-30
  • 地方“武教头”走进军营辅导授课 2019-04-30
  • 有神论跟无神论的差别在哪你都不知道,还要扯啥呢。 2019-04-24
  • “ONE NIGHT 给小孩”北京站探访 周迅刘雯共奏可爱“交响曲” 2019-04-07
  • 830| 41| 112| 146| 964| 696| 710| 241| 856| 421|